PermaSafe 225

Raeser Design has now completed manufacturing of the first PermaSafe 225, a water bore service and installation rig for Advanced Pump Technologies.  This project was undertaken to design a purpose built machine from the ground up to safely install andservice water bores in the mining sector.  It removes the need to work under suspended loads and makes the process of installing Fiberglass Reinforced Pipe(FRP), pumps, power cables and safety cables as hands free as possible.  By utilising a CanBus control system for the hydraulics the entire truck is able to be operated from a remote control for added safety and visibility.

 

Resource Equipment LTD (REL) have purchased the first unit and have made a promotional video which can be seen below.  Double click for full screen view.


Specs at a Glance:

  • MAN TGM18340 4x4 truck
  • Onboard Hydraulics 150Lpm @ 205Bar
  • 13 tonne pullback (225m of 8" riser and pump, cables etc)
  • Powered cable reel
  • Safety winch (13T capacity)
  • Hands free rod handling with removable rod bin
  • CanBus control system for hydraulics
  • Remote controlled for operator safety
  • Manual controls for use in emergency

 PermaSafe 225 design concept 

 

 


Resource Equipment Ltd has shown they want to lead the industry into the new age of safely installing FRP for water bores and dewatering purposes on the mine by purchasing the first PermaSafe 225 out of the factory!

 

 


First unit's initial commissioning

 

 


 First unit's initial commissioning